The script run order comes into play when multiple scripts must run at the same time on a CPE device; the run order determines which script runs first.
For example, you can add two scripts, each of which runs automatically when the device is registered. By default, the script that was added before the others runs first.
You can customize the run order in the CPE template. The run order specified in the template applies to all devices that use the template.
To configure scripts run order:
A table of CPE templates is displayed.
The settings area is displayed in the lower part of the page. You can expand the settings area to fill the entire page by clicking the expand button .
The tab displays settings for connecting the VNFM to the CPE device console, as well as a table of scripts, if at least one script is added.